Moving along with the installation of the trim boards and rivets. The lower, unpainted, portion of the walls will be covered with acoustic absorbing insulation which will then be covered with a blue-gray fabric.
Above, the ducts have all been painted and permanently installed.
No comments:
Post a Comment